Flat Roof Replacement for a Commercial Building
Location
Webster, NY
Roof Size
1,800 sq ft.
Project Duration
3 Business days
Materials Used:
• Commercial-grade TPO membrane
• EPDM for transitions and tight-access areas
• Torch Down for perimeter and parapet reinforcement
• Rigid insulation (polyiso)
• Ice & Water Shield underlayment
• 1/2” plywood replacement where needed
Client Request
The client needed a full roof replacement due to ongoing leaks and deteriorated roofing materials.
Key requirements were:
— Maintain proper insulation and internal temperature (the building houses equipment and inventory)
— Avoid disruption to business operations during installation
Scope of Work
• Full removal of the old roofing system and substrate cleaning
• Replacement of damaged plywood decking
• Installation of tapered rigid insulation for proper drainage
• TPO membrane installed as the primary roofing system
• EPDM used for complex areas and transitions
• Torch Down applied on parapets and high-risk perimeter zones
• Flashing and sealing of all penetrations, vents, and joints
• Final water-tightness inspection and quality check
Client Feedback:
“The team delivered excellent quality on schedule. The roof held up perfectly during the first heavy rain. Very professional service — highly recommend!”


Warranty & Standards
• Workmanship Warranty: 10 years
• Material Warranty: As per manufacturer specifications
• Installed in full compliance with commercial standards from GAF, Mule-Hide, and Firestone